Role Definition
Aventa is seeking, on behalf of our client—a leading developer in the offshore renewable energy sector—a Client Representative for Cables to join their Construction Department. This role offers a unique opportunity to work alongside a team of skilled engineers contributing to one of the most significant offshore wind developments in the region.
Role Overview:
Act as the Ørsted project representative on board Boulder Clearance Vessel during seabed preparation activities
Key Responsibilities / Tasks / Deliverables:
-
Maintain an accurate record of all installation activities on a daily basis throughout the execution phase
-
Ensure that all relevant approved procedures and risk assessments are followed by the Contractor
-
Ensure the Contractor proactively manages safety and quality
-
Act, behave and lead by example according to Ørsted’s values
Tasks:
-
Prepare and distribute Daily Progress Reports (DPR) as required
-
Ensure the DPRs are signed by all required parties
-
Review and understand RA/MS and QHSE documents as required before execution phase commences and keep updated on changes in the documents
-
Attend daily meetings, toolbox talks and any other discussions to ensure that the works are being carried out in a safe manner to the required quality
-
During all defined key activities and otherwise as often as practicable be present as a witness during installation. Access all work areas provided it is safe to do so. Screen all installation progress reporting tools used by Contractor
-
Participate in safety walks with HSE representatives from Ørsted and Contractor organisations
-
Synergi reporting as supervised by the specific package and project from incidents and from safety walks
Output:
-
Daily recording of activities relating to seabed boulder clearance/seabed preparation (including screening boulder/debris target list/register)
-
Submission of completed and signed DPR
-
Immediate reporting of any safety, quality, or procedural deviations
-
Report on Contractor equipment upkeep/maintenance programmes
Decision Authority:
-
Authority to intervene or stop the operation in case of safety, quality infringements or the procedures not being carried out as per approved RAMS
-
Can recommend and agree to minor changes to the various works ongoing on a daily basis
Qualification / Requirements:
Mandatory:
-
GWO courses: Sea Survival, Working at Heights, First Aid, Fire Awareness, Manual Handling
-
HUET, STCW 2010, OPITO or BOSIET and EBS (STASS, HEED or EBS)
-
OEUK (or equivalent) medical certificate including Chester Step
-
IOSH Managing Safely or similar HSE training
-
Minimum 5 years of relevant work experience in seabed boulder clearance/seabed preparation operations (ROV grab, PLGR, cable cutting etc.)
Preferred:
-
LOLER and CDM
-
Marine awareness qualifications as required by the package role
-
Minimum 10 years of relevant work experience as offshore client representative
-
IT proficient (Microsoft Word, Excel and Internet); Ørsted DPR and Synergi reporting tools
Reporting to: Offshore Installation Manager, Array Cable Installation
Office Location is Humberside (HUY)
Vessels for boulder relocation: Normand Subsea and Seaway Phoenix
Contract can be further extended if Consultants have relevant experience in Cable lay – preferred candidates
- Start date: 28 October 2025
- End date: 31 March 2026
- Duration: 154 days
- Location: Grimsby
- Country: Grimsby
- Contract type: Freelance
- Seniority level: SENIOR