Project details

The 21 concrete caissons (16,500 tonnes), forming the breakwater will be built by Eiffage in Dakar, Senegal. Also, 2.5 million tons of quarry materials required for the underwater rumble mound for the caissons bed is expected to be produced, transported, and loaded for installation from Mauritania.

As for Saipem’s scope, it includes the use of subsea construction vessel Saipem 3000 for the installation of berthing and loading facilities. Up to 22,000 tonnes of marine structures will be fabricated at the Saipem shipyard in Indonesia in Karimun, the biggest construction yard in Southeast Asia.

Role Definition

  • Monitoring and updating cost estimates for projects to ensure that costs are within expected ranges
  • Reviewing expense reports to ensure that expenses are reasonable and appropriate for the circumstances
  • Coordinating with other departments such as human resources, payroll, accounting, and finance to ensure that all costs are accurately tracked
  • Conducting cost analyses to identify areas where costs can be reduced or eliminated altogether
  • Monitoring budgets to ensure that spending does not exceed approved levels
  • Collecting cost data from suppliers or subcontractors to track material costs
  • Preparing reports to management regarding costs and expenses
  • Preparing bid estimates for new projects or bids on existing projects
  • Managing supplier relationships to ensure that the company is receiving quality products at competitive prices

Qualification

  • Knowledge in SAP

Conditions

Location : Paris area

  • Duration: 12 months (extendable) - Long term opportunity
  • Location: Paris (Saint Quentin en Yvelines)
  • Country: France
  • Seniority level: Junior Engineer, Senior Engineer
  • Field of activity: Offshore / subsea oil &gas
Position Expired
other jobs