Project details

Offshore wind farm, Offshore power cable, Cable Protection Systems (CPS)

Role Definition

Exploration and Development in Marine Energy Technologies.

Detailed work programme

The Trainee will be assigned the following activities:

– Modelling of floating structures and subsea assets using dedicated software (e.g. Orcaflex, Deeplines, FE tool, etc.)

– Design and analysis of marine operations

– Global and local analyses for offshore structures (steel structures, submarine cables, pipelines, etc)

– Write calculation notes, analysis reports, specification of material and engineering presentations


Knowledge, skills and competences to be acquired

Understanding the principles of marine energy technologies.

Familiarity with some engineering aspects of offshore structures and installation analysis.

Monitoring plan

The progression of the student will be checked monthly with a personal meeting with the mentor.

Evaluation plan

Final evaluation based on the completion of assigned tasks and overall performance.

Job mobility

The internship does not involve job mobility but visit to clients can be possible.

Number of working hours per week

40 hours per week


Qualification

Final Year of Engineering shool with a focus on offshore 


Conditions

Office based.

  • Start as soon as possible
  • Duration: 6 Months
  • Location: Genova
  • Country: Italy
  • Contract type: Permanent or Contractor
  • Seniority level: Junior Engineer
  • Field of activity: Power Generation
Position Expired
other jobs