Project details

Offshore Wind

Role Definition

  • In charge of the Site follow-up of activities for Windfarm foundation projects performed by SubCo personnel.
  • In charge of the witnessing and validation of manufacturing completion activity performed by SubCo personnel
  • In charge of the timely and safe execution and recording of Commissioning and testing activities.
  • Based in the fabrication yard located in Le Havre up to completion site execution.
  • Then will supervise the Commissioning Offshore period.
  • Missions can be performed over the period in Germany, and Danemark.

Qualification

  • Language : Fluent in English and French.
  • Experience : Commissioning in industry mandatory / offshore plant is a plus / E&I background is a must
  • Communication network/protocol knowledge is a plus.
  • Software : MS office tools mandatory / MCS knowledge is a plus
  • Electrical Habilitation mandatory (B2 minimum).
  • Bosiet and GWO is a must.

Conditions

Location : Saipem SA + Site LE HAVRE and OFFSHORE France

  • Start date: 04 January 2022
  • Duration: 6 months (extendable)
  • Location: Paris (Saint Quentin en Yvelines) + On site mission
  • Country: France
  • Seniority level: Supervisor
  • Field of activity: Offshore Renewable Energy
Position Expired
other jobs