Project details

BUZIOS P79 :

The Buzios field is located nearly 200 kilometers (km) off the coast of Rio de Janeiro state at a water depth ranging from 1,600 to 2,100 meters (m). Petrobras presented the proposal for the Declaration of Commerciality in December 2013. The field is estimated to produce over 2 million barrels of oil equivalent per day (boed) by the end of the development phase that will allow it to become Petrobras’ largest production asset.

Role Definition

  • Mechanical Handling Engineer in charge of Handling Philosophy,
  • Definition of equipment up to the issue of material requisition,
  • Performed TBE and vendor follow-up.

Qualification

  • Knowledge of pedestal crane,
  • Jibcrane and Handling Equipment, etc…
  • English fluent

Conditions

Location : Paris area

  • Start as soon as possible
  • Duration: 12 months (extendable) - Long term opportunity
  • Location: Paris (Saint Quentin en Yvelines)
  • Country: France
  • Seniority level: Junior Engineer, Senior Engineer
Position Expired
other jobs