Role Definition
Job description:
• Analyze, recommend and optimise offshore installation, logistics concepts and installation procedures prior to and during installation.
• Prepare technical invitation-to-tender documents
• In cooperation with Package and Contract manager; tender, negotiate and recommend installation contracts incl. MWS.
• Manage offshore installation contractor and MWS incl. cross discipline cooperation within the project team.
• Ensure contractor’s delivery and own review of method statements and risk assessments
• Set up and implement HAZID/HAZOP for installation design / offshore installation operations.
• Provide progress reports to PM for all managed contracts incl. all significant technical risks, and develop contingency plans.
• Supervise and approve trialing, tool development, loading and vessel setup
• Supervise installation campaign initiation offshore • Manage Client’s Representatives and QA Daily Progress Report
• Create, monitor and Control execution of Design Quality (Reporting) and QAS and align input from Supplier quality
• Management of product NCR
• Review of method statements from Supplier
• Review of product and as-built documentation during AP execution phase
Requirements:
– We need an experienced person preferably with knowledge of Ørsted
– Knowledge of Array cable installation
– Knowledge of cable laying
– Knowledge of cable pulling
– Knowledge of cable protection systems
- Start date: 19 May 2025
- End date: 30 April 2027
- Duration: 711 days
- Location: London
- Country: London
- Contract type: Freelance or Permanent
- Seniority level: SENIOR