Role Definition

Responsibilities and Duties

15/11 to 30/11: Preparatory phase at the office in Paris La Defense

01/12 to 15/03: Operations in Batam – Indonesia: Pipe Load Out from Trucks to Pipe Carrier Vessels (4 Off) in Batam – Indonesia (in rotation approx 2w/2w; 12h/d, 7d/week on site):

– General supervision of the operations: ensuring procedures are followed, HIRA mitigations are in place, identify / manage MoC if required, Follow TFMC HSE Policy / Duty of Care.

– Riggers, Subcontractor and vessel owner coordination

– Reporting (DPR’s) and HLPR (High Level Progress Report)

  • Start date: 14 November 2024
  • End date: 2025-03-14T23:00:00.000Z
  • Duration: 120 days
  • Location: Paris, Indonesia
  • Country: Indonesia
  • Contract type: Permanent
  • Seniority level: SENIOR