Role Definition
Activity 1: NOY Pre-piling T&I Activities
• Back-office engineering support during prepiling activities
• Coordination with MWS in terms of engineering documentation review
• Review of as-built documentation incl. surveys
• Compliance check with Employer’s requirements, design documentation and certification conditions
• Determine technical actions to be carried forward to next installation phase
Activity 2: NOY Jacket & Topside T&I Activities
• Review of OSS jacket and topside T&I engineering documentation (engineering reports, method statements, risk assessment)
• Support the management of the technical / engineering related interfaces between T&I contractor and jacket and topside contractors (incl. respective designers)
• Back-office engineering support during OSS jacket and topside T&I activities.
• Coordination with MWS in terms of engineering documentation review
• Review of as-built documentation incl. surveys
• Compliance checks with Employer’s requirements, design documentation and certification conditions
• Determination and follow-up on punch list items and actions carried forward to next phases (commissioning,
operation)
Activity 3: TRE Jacket, Piles & Topside T&I
• Review of OSS jacket, piles and topside T&I engineering documentation (engineering reports, method statements, risk assessment)
• Support the management of the technical / engineering related interfaces between T&I contractor and jacket and topside contractors (incl. respective designers)
• Back-office engineering support during OSS jacket, piles and topside T&I activities.
• Coordination with MWS in terms of engineering documentation review
• Review of as-built documentation incl. surveys
• Compliance checks with Employer’s requirements, design documentation and certification conditions
• Determination and follow-up on punch list items and actions carried forward to next phases (commissioning, operation)
Participation to Meetings & Workshops
In order to ensure a continuous communication between the Client and the Service Provider, a series of meetings will be organised by Client throughout the duration of the Contract.
Attendance and participation to these meetings will be key to ensure communication and alignment between the parties.
Coordination Meetings
Among the recurrent meetings organised by Client, the Service Provider may be requested to attend to monthly coordination meetings. These meetings will aim at:
– Measuring performance of the Contract execution,
– Reviewing upcoming needs for additional activities and termination of on-going activities as the case may be,
– Holding discussions on challenges, difficulties, lessons learnt.
From time to time, the coordination meetings could be face-to-face meetings held in the Client’s offices in Paris-La Défense (France) as well as on the several yards of Client’s contractors, including Flushing (The Netherlands), Saint Nazaire (France), Puerto Real (Spain). However, if jointly agreed, those meetings will normally be held through conference call or teleconference call.
Note:
– The agenda of coordination meetings is at this stage preliminary and will be fine-tuned all along contract execution,
– The frequency of these meetings may vary (increased, decreased or even suspended) during periods when exchanges do not seem to be necessary.
Ad-hoc Meetings & Workshops
In addition, various ad-hoc meetings or workshops will also take place. If Client judges it relevant, the Service Provider will be requested to attend to these ad-hoc meetings.
Conditions
Type of Assignment: Consulting
Seniority: Between 5 and 20 years of experience
Location & travel: Paris La Défense // Home work // Occasional travel
Job Purpose: OSS T&I engineering
- Start as soon as possible
- Location: La Defense
- Country: France
- Contract type: Permanent or Contractor
- Seniority level: Senior Engineer
- Field of activity: Offshore Renewable Energy
other jobs