• Start date: 2018
  • End date: 2019
  • Country: Germany
  • Water Depth: 40 m
  • Type of Project: Offshore Wind Farm
  • Output of project barrels / watts / km: 110 MW
  • Number of Turbines (OWF): 16
  • Aventa Service: Provision of Engineering Personnel and Engineering Studies for Cable Design, Installation and Operations