• Start date: 2018
  • End date: 2019
  • Country: China
  • Water Depth: N/A
  • Type of Project: Subsea HVAC Interconnector
  • Output of project barrels / watts / km: 32 km
  • Aventa Service: Provision of Engineering Personnel and Engineering Studies for Cable Design, Installation and Operations