Home | Jobs offer |
Offshore Client Representative – WTG Final Walkdown (Full GWO)
Published on May 6, 2026
Description
MissionAs part of a floating offshore wind pilot project in the Mediterranean Sea, we are looking for an Offshore Client Representative to carry out WTG Final Walkdowns.
Context
- Floating offshore wind project – Mediterranean Sea
- Theoretical dates: May 28 to June 2 (subject to change based on weather conditions and technical issues during WTG trial runs)
- Offshore on-site intervention
Responsibilities
- Perform final inspections (Final Walkdown) of offshore wind turbines
- Verify compliance and proper functioning of WTGs prior to commissioning
- Monitor trial runs and report any anomalies
- Represent the client's interests on the offshore site
Required Qualification
Required Profile- Full GWO certification mandatory
- Proven experience as an Offshore Client Representative in the wind energy sector
- Familiarity with Vestas V164 turbines strongly preferred
- Knowledge of WTG Final Walkdown procedures
- Ability to work offshore and adapt to weather and operational constraints
- Available from May 28 to June 2 (with flexibility)
Summary
- 11210 Port-la-Nouvelle, France
- Freelance
- Based on experience
- Experience
- Min. 5 years
- Education
- Bac +4/+5 or more